Prishtina e Re Prishtinë
For sale are apartments in the "Liza" complex, Building 4, constructed by R&Rukolli, in New Pristina, on "Holger Petersen" Street.
The complex is organized as an urban whole and is located near institutional buildings, in an area that has special treatment from the municipality of Pristina in terms of architectural and infrastructural aspects, as this area is planned for the construction of state buildings that offer the greatest development in the capital.
The apartments have different sizes and are located on different floors, all being two-bedroom units with the following specified layout;
*Apartment with a living area of 106.31m² and a terrace of 17.90m², has the following internal space arrangement; living room, kitchen with dining area, two bedrooms, bathroom, toilet, terrace, and balcony.
*Apartment with a living area of 106.31m², has the following internal space arrangement; living room, kitchen with dining area, two bedrooms, bathroom, toilet, and balcony.
*Apartment with a living area of 104.6m² and a terrace of 74.14m², has the following internal space arrangement; living room, kitchen with dining area, two bedrooms, bathroom, toilet, terrace, and balcony.
*Apartment with a living area of 104.6m², has the following internal space arrangement; living room, kitchen with dining area, two bedrooms, bathroom, toilet, and balcony.
The complex has an electric heating system and is awaiting connection to Termokos.
The complex has Typology “D” of buildings defined by the municipality of Pristina, which has specific provisions for organization and materials,
- Two elevators for each building,
- Sufficient garages in the basement as well as parking spaces in the yard,
- Greenery and sufficient spaces for residents,
- Bicycle and scooter parking,
- Children's playground and green park within the complex,
- On three sides of the buildings, there are neighborhood roads that connect to the main roads of this area.
New Pristina is an area that is being developed with the potential to be one of the developed areas of the city with completed infrastructure, making this location very suitable for living and investment, an area with new quality constructions close to all necessary services.
*The complex will complete construction by the year 2027.
By filling out the following form, our agent will inform you about your questions!